Federal Government Consultant communication system lightning immunization, WA & Canberra.
Specific project assignment’s include:
DBP– Electrical Installations, Earthing and CP Compliance verification and report.
Develop and implement specalized earth systems for Woodside Petroleum Karratha WA.
Preliminary testing & costing HUGL RSR Project PTA WA
Earth System installation integration and design varification 132kV substation, Lightning Protection & Bonding. PTA WA
Supply Authority Inspector, Mines Power, Earthing and lightning Protection – RIO & BHP WA
Specific projects – Personal Involvement
& completion
Lightning strike investigation and installation safety review CMS Energy Dongara,
INPEX Gas Darwin Lightning Protection and Earth systems design & compliance report and recommendation.
Forensic investigation of Lightning / earth related bushfire – Alcoa Kwinana.
Woodside Petroleum Earth system failure and associated fire investigation & report.
Woodside Petroleum Earth system inspection upgrade specification.
Design of Earth and Lightning Protection system for Paste Injection Plant – Philippines.
Expert Witness Victoria County Court, Lightning injury claim incident.
Forensic Engineering for Pipeline Fatality – Jackson Mc Donald Perth.
Forensic Engineering for Insurance – Transformer failure UWA & House Fire claim 2001
Forensic Engineering for Fast Food building Fire – WA Office of Energy.
Earth and Lightning Protection System Audit Philippines to immunise whole of plant for no failure, as demonstrated by previous design.
Near field Induction studies & reports for conductor sizing & induced voltage mitigation, overhead Lines, pipelines, mixed circuits in common duct systems.
Optimising earth electrode installation for multiple electrode systems.